Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC AC § 27-869.03?

Quick Answer

This section outlines the requirements for reducing flue size when converting fuel types or using existing chimneys for fireplaces or wood-burning appliances. It specifies standards for fireclay and cast-in-place chimney linings, including installation and verification criteria. Applies to building owners making modifications to flue systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-869.03 Reduction of flue size.

AC § 27-869.03

Conversion from one fuel to another or the use of an existing chimney to service a fireplace or wood burning appliance may require a flue size change for proper operation. This may be done if the redesigned flue meets the criteria for the fuel and chimney type to be used as set forth in this subchapter.

(a)Individual fireclay flue linings, in conformance with reference standard RS 15-14 or the equivalent not less than five-eights inch thick, may be used but shall be carefully bedded one on the other in medium-duty fireclay refractory mortar in conformance with reference standard RS 15-6 or the equivalent as determined by the commissioner, with close fitting joints left smooth on the inside. Linings shall be separate from the chimney wall and the space between the liner and masonry shall not be filled; only enough mortar shall be used to make a good joint and hold the liners in position.

(b)Cast in place chimney linings.

(1)Cast in place linings shall be installed in accordance with reference standard RS 15-16 and with their listing and acceptance.

(2)The applicant prior to the installation of the lining shall verify that the chimney meets the requirements of reference standard RS 15-4 and is in a sound and uncracked condition, that spalling has been removed and that there are no carbon or creosote deposits.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 27-869.03?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters