What is NYC AC § 27-830?

Quick Answer

This section outlines the requirements for the installation and maintenance of piping systems, including specifications for materials, support, and protection against damage. It mandates the installation of relief valves and vent pipes for oil storage tanks, ensuring safety and compliance. Applies to building owners managing fuel oil systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-830 Piping.

AC § 27-830

(a)Installation of piping and tubing.

(1)Exposed piping shall be protected against mechanical damage and shall be adequately supported with rigid metal fasteners or hangers. All pipes connected to buried tanks, except test well piping, shall be provided with double swing joints at the tank.

(2)Only new wrought iron, steel, or brass pipe, or type K or heavier copper tubing, or aluminum alloy tubing, properly identified, may be used. Metal tubing when used for conveying oil shall be adequately protected. Such tubing may be installed at the burner without protection. Drawn tubing when used in domes- tic installations shall be of at least 3/8 in. inside diameter up to the shut-off valve at the burner. Soldered connections shall be prohibited.

(3)Overflow pipes, where installed, shall not be smaller in size than the supply pipe.

(b)Relief valves.

(c)Fuel oil heaters. Fuel oil heaters shall not be installed within the steam or water space of a boiler. Fuel oil heaters and the connecting piping shall be arranged to prevent oil leakage from being transmitted to the boiler. This may be accomplished by any of the following methods: (1) By discarding the condensate from the heaters.

(4)By a sight tank arrangement for collecting and inspecting the condensate which is provided with a pump controlled by a hand switch for returning the condensate to the normal return system.

(5)By such other method as may be permitted by the commissioner.

(d)Vent pipe.

(e)Fill pipes.

(f)Piping from transfer pump to equipment or to storage tanks above the lowest floor.

(6)The piping shall be located and secured from movement so as to prevent undue stress on the piping and to isolate the piping from vibrations from any equipment.

(7)Pipe connections to the main header (supply or return) shall be made from the top of the header, except for systems described in paragraph (11) of this subdivision.

(8)Required air vents and vacuum breakers shall be designed for their required use.

(9)All air vents and vacuum breakers shall be hard piped to a curb or pan as provided for in subdivision (b) of section 27-829.

(10)In systems with equipment above the lowest floor where such equipment is designed to operate utilizing fuel stored above the lowest floor, piping diameters shall not exceed four inches. However, where an applicant demonstrates by the inclusion of calculations on the plans that a greater diameter is necessary to ensure the proper flow for the functioning of the system, such greater diameter may be permitted. All oil stored above the lowest floor shall be in tanks complying with subdivision (b) of section 27-829 of this code; piping shall not be used for fuel storage purposes.

(11)In systems with equipment above the lowest floor where such equipment is designed to operate utilizing fuel pumped as needed from the lowest floor and without utilizing fuel oil stored above the lowest floor, piping diameters throughout such systems shall not exceed the design flow (three times the maximum firing rate as calculated by the engineer or architect). However, piping diameters within rooms containing such equipment may exceed the calculated design flow pipe size to provide limited reservoir storage to prime equipment, provided such reservoir storage is counted toward the maximum two hundred seventy-five gallons of oil storage per story as provided for in subdivision b of section 27-829 of this code.

(g)Heating coils in storage tanks. The heating of oil in storage tanks shall be by means of coils using low pressure hot water or steam, or by means of electric heaters approved for use in oil storage tanks.

(h)Valves and devices to control the flow of oil.

(i)Oil level indicating devices and test wells.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 27-830?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters