What is NYC AC § 27-709?

Quick Answer

This section outlines the requirements for cast-in-place concrete piles, including their description, materials, and installation procedures. It specifies the conditions under which concrete piles may be cast, the materials used, and the necessary inspections before filling with concrete. Applies to contractors and engineers involved in pile installation.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-709 Cast-in-place concrete piles.

AC § 27-709

(a)Description. Cast-in-place concrete piles shall be cast in shells previously installed in the ground or, with the limitations indicated in section 27-697 of article seven of this subchapter, may be cast in an uncased hole. Cast-in-place piles may be tapered or cylindrical, or a combination of tapered and cylindrical shapes.

(b)Materials. Concrete for cast-in-place concrete piles shall conform to the requirements of article five of subchapter ten of this chapter. Slump shall be five inches plus or minus one inch. Where the pile shell is assumed to contribute to the capacity of the pile as a structural member, the shell shall be of metal and shall conform to the provisions of article six of subchapter ten of this chapter or section 27-712 of this article. Where the pile shell is not assumed to contribute to the capacity of the pile as a structural member, the shell may be of any material that will adequately resist the driving stresses and maintain an open well to receive the concrete. End closures for shells shall not project more than one-half inch beyond the outer limits of the pile when bearing in soils of class 6-65 or lower.

(c)Installation.

(1)After installation to final depth and immediately before filling with concrete, the inside of the tube, shell, or bore shall be thoroughly cleaned to the bottom and inspected by lowering a drop light or by means of a light beam. To be accepted: (a) the pile shall be free of collapsed sections of shell and the pile shell shall not show any tears; (b) the pile shall be free of water except that a minor amount of water may be allowed to occur in the pile if it be absorbed by placing a suitable amount of dry cement-sand mixture in the tip end of the pile; and (c) the alignment of the pile shall conform to the provisions of section 27-691 of article seven of this subchapter. If the bottom of the casing is out of sight, the shape and alignment of the casing shall be surveyed with a suitable instrument, or the pile rejected.

(2)Concrete shall be placed by such methods that the entire volume of the tube, shell, or bore is filled and in a manner that will preclude separation of the ingredients.

(3)No concrete shall be placed in a cast-in-place pile until all piles within a radius of fifteen feet, or within the heave range, have been driven.

(4)Rejected pile shells shall be filled with concrete or sand.

(5)The concrete cap shall not be placed until at least one hour after all piles within the cap group are completely filled.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters