Quick Answer

This section establishes requirements for the minimum spacing of piles to ensure adequate load distribution to supporting soil. It specifies that the center-to-center spacing should not be less than twenty-four inches and outlines conditions for closer spacing under certain circumstances. Applies to building owners involved in construction and foundation work.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-692 Minimum spacing of piles.

AC § 27-692

Piles shall be spaced to meet the following requirements: (1) Spacing of piles shall provide for adequate distribution of the load on the pile group to the supporting soil, in accordance with the provisions of subdivision (b) of section 27-700 of article eight of this subchapter.

(2)In no case shall the minimum center-to-center spacing of piles be less than twenty-four inches, nor less than the values for specific types of piling as indicated in article ten of this subchapter. Unless special measures are taken to assure that piles will penetrate sufficiently to meet the requirements of section 27-689 of this article without interfering with or intersecting each other, the minimum center-to-center spacing of piles shall be twice the average diameter of the butt for round piles; one and three-quarters times the diagonal for rectangular piles; or, for taper piles, twice the diameter at a level two-thirds of the pile length measured up from the tip. In cases of practical difficulty, the spacing of new piles from existing piles under an adjacent building may be less than the above values provided that the requirements relating to minimum embedment and pile interference are satisfied and that the soil under the proposed and existing buildings is not overloaded by the closer pile grouping.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 27-692?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters