§ 50-01 — Requirements for the Installation of High-Pressure Natural Gas-Fired Microturbine Systems.

Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC RCNY § 50-01?

Quick Answer

(a) General requirements. All microturbine systems shall comply with the following general requirements: (1) Description.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 50-01 Requirements for the Installation of High-Pressure Natural Gas-Fired Microturbine Systems.

RCNY § 50-01

(a)General requirements. All microturbine systems shall comply with the following general requirements: (1) Description.

(i)The Microturbine System shall include one or more combustion-based turbine-driven electrical generators with 500 kW or less capacity, natural gas compressing equipment, heat recovery devices, electrical power distribution devices, gas vents or chimneys and associated appurtenances.

(ii)Microturbine systems shall utilize natural gas at an inlet pressure to the system of not greater than 3 psig, and shall boost the gas pressure to an inlet pressure to the combustion device of greater than 15 psig within the unit or room enclosure.

(iii)The total nominal electrical capacity at standardized operating conditions of all microturbine systems located within a single building shall not exceed 2,000 kW.

(2)Listing or MEA approval. For microturbines with external compressors, the compressor shall be MEA-approved and all components of the compressor and the microturbine shall be listed by a nationally recognized testing laboratory approved by the Commissioner. For microturbines with the compressor integrated with other elements into the unit, the integrated unit as well as each of its components shall be listed by a nationally recognized testing laboratory approved by the Commissioner.

(3)Utility ruling. The applicant shall consult the appropriate utility company regarding the characteristics of existing gas and electrical service to the site before installing the microturbine system. The applicant shall provide to the Department prior to plan approval either documentation from the utility company confirming that the electrical interconnection requirements have been preliminarily satisfied or an affidavit from the owner that there will be no interconnection with the electrical grid.

(4)Filing and permit. Plans for the complete microturbine system installation shall be approved by the New York City Department of Buildings and a work permit shall be obtained. A set of the approved plans shall be provided to the Fire Department.

(5)Installation.

(iv)Automatic gas shut-off. Gas supply to the microturbine shall be provided with an automatic shut-off valve that is activated by a malfunction alarm from any component of the microturbine system.

(v)Remotely and manually controlled emergency gas shut-off. A normally closed solenoid gas shut-off valve shall be located immediately after the branch connection providing dedicated service to the microturbine installation. The valve shall be manually controlled at the valve and remotely controlled both outside the door(s) to the microturbine room and at a supervised location. The gas shut-off valve and the controls shall each be clearly identified with signage indicating "emergency gas shut-off to microturbine." (vi) Fuel shut-off valve diagram. A diagram shall be conspicuously posted on any door or gate leading to a microturbine indicating the locations of all manual and automatic fuel shut-off valves.

(vii)Security. The microturbine shall be provided with adequate protection from theft, tampering and unauthorized use. Access to microturbine systems shall be restricted by locked doors but shall be readily accessible for maintenance, repair and Fire Department access. Microturbines shall be adequately protected from vehicle impact.

(viii)Manufacturer's requirements. All manufacturer's requirements and recommendations shall be satisfied.

(ix)Signage. Signage clearly stating "HIGH PRESSURE GAS" shall be posted on or in front of the microturbine or microturbine system, and on the outside of all doors accessing any microturbine room.

(x)Existing buildings. For installation of microturbines in existing buildings, a structural evaluation of the method of support of the microturbine system shall be performed by a licensed engineer. Vibration isolation shall be provided for the microturbine system as required to mitigate vibration impact on the building structure.

(6)Inspection. Gas piping serving the microturbine shall be inspected by the Department. No self-certification of inspection shall be permitted. The inspection shall include a pipe integrity pressure test of all distribution piping. Installation and assembly of all system components shall be subject to a controlled inspection, in accordance with Section 27-132 of the New York City Building Code. Gas will be turned on only after successful completion of all testing.

(7)Fire Department permit. A Fire Department permit is required to operate the equipment.

(8)Fire Department Certificate of Fitness. A certificate of fitness ("C of F") holder, as authorized by the Fire Department, shall be required on the premises during regular business hours. The C of F holder shall be trained by the manufacturer or his authorized agent to shut down the equipment in an emergency.

(9)Service contract. The owner shall obtain a service contract from the microturbine manufacturer or a service company qualified by the manufacturer upon approval of the microturbine installation, and shall maintain it during the life of the installation.

(b)Permitted locations.

(1)Outdoors at grade, on a roof or on a roof setback, within an integral weatherproof or lightweight enclosure acceptable to the manufacturer, subject to the following: (i) Clearances. All components of the microturbine system shall be located a minimum of 4 feet from a wall or parapet, 8 feet from any building opening, including any door, operable window or intake opening and 5 feet from any exhaust termination or chimney. All microturbine systems located at grade shall satisfy the following clearances: A. 50 feet from any subway entrance, exit, vent or other opening; B. 20 feet from any above-ground flammable or combustible liquid storage tank; C. 10 feet from any lot line, except 4 feet from any lot line in and adjacent to a manufacturing district; D. 5 feet from any vent or fill line of any flammable or combustible liquid storage tank; E. 5 feet from any parked motor vehicle.

(vi)Other equipment. Equipment not directly associated with the microturbine system, including but not limited to gas meters, shall not be permitted within the mechanical equipment penthouse.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 50-01?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters