What is NYC RCNY § 4-15?

Quick Answer

(a) Definitions. Opening Protective Assemblies.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 4-15 Inspection of Approved Opening Protective Assemblies.

RCNY § 4-15

(a)Definitions. Opening Protective Assemblies. "Opening Protective Assemblies" shall include fire rated doors, steel curtain type fire rated doors, fire rated windows, fire rated dampers, and similar types of assemblies.

(b)Jurisdiction. The Board of Standards and Appeals will accept amendments to applications which were originally approved before the effective date of the Administrative (Building) Code (December 6, 1968), and will accept appeals of applications which are denied by the Department of Buildings.

(c)Testing and inspections.

(1)Before any fire rated Opening Protective Assembly is used in New York City, it shall be tested as required in Reference Standards RS 5-6 or RS 5-7 of the Administrative (Building) Code of the City of New York (Local Law No. 76 of 1968) and must receive either the Acceptance of the Materials and Equipment Acceptance (MEA) Division of the Department of Buildings or the Approval of the Board of Standards and Appeals.

(2)The Board of Standards and Appeals may, upon the submission of satisfactory information, approve assemblies which are oversized and too large for the available test facilities.

(3)Opening Protective Assemblies shall be inspected at the place of manufacture on a regular and frequent basis by a recognized testing laboratory approved by the Board of Standards and Appeals or the Department of Buildings as having proper facilities; or it may be inspected under the direction of a Licensed Professional Engineer (P.E.) or Registered Architect (R.A.), in accordance with the provisions of § 27-329 of the Administrative (Building) Code.

(4)The authorized inspector (authorization as detailed in 2 RCNY § 4-15(c)(3)) shall inspect the assembly in sufficient detail during production to assure that the completed units comply in all respects with the Approved or Accepted specifications on file at the Board of Standards and Appeals or at the MEA Division of the Department of Buildings, and thereby authorize a label indicating such compliance.

(d)Labeling requirements.

(e)Construction and installation.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 4-15?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters