§ 18-61 Variances.
RCNY § 18-61
(a)The Commissioner may, in his or her discretion, upon written application from the applicant, grant a variance from the requirements of these rules and regulations for a regulated activity and for the alteration or modification of a noncomplying regulated activity.
(1)An application for a variance for a regulated activity or for an alteration or modification of a noncomplying regulated activity shall: (i) Identify the specific provision of the rules and regulations from which the variance is sought or identify the nature and extent of the alteration or modification of the noncomplying regulated activity; (ii) Demonstrate that the variance requested is the minimum necessary to afford relief; and (iii) Demonstrate that the activity as proposed includes adequate mitigation measures to avoid contamination to or degradation of the water supply which are at least as protective of the water supply as the standards for regulated activities set forth in these rules and regulations.
(2)In granting variances the Commissioner may impose specific conditions, including evidence of financial security, time limitations and limitations on any transfer of the variance granted. In addition, the Commissioner may grant a lesser variance than that applied for.
(3)Any proposed substantial alteration or modification of an activity that has been granted a variance under this subchapter shall require the review and approval of the Department and shall comply with the provisions of this subchapter.
(4)The burden of proof for a variance shall be on the applicant.
(5)Except for a variance granted for an alteration or modification of a noncomplying regulated activity, a grant of a variance for a regulated activity shall not be deemed to make such activity a noncomplying regulated activity under these rules and regulations.
(b)An appeal of a denial of a variance for a regulated activity or a denial of a variance for an alteration or modification of a noncomplying regulated activity may be made in the manner specified in 15 RCNY § 18-28.
(c)Failure to comply with any condition of a variance for a regulated activity, or for a variance for an alteration or modification of a noncomplying regulated activity shall be a violation of these rules and regulations. The Department shall review the terms and conditions of each variance granted at least once every five years to determine whether the terms and conditions of the variance have been complied with.
(d)Variances within coliform and phosphorus restricted basins.
(e)Variances Within the 60 Day Travel Time to Intake in the Croton System.
(ii)There is no other feasible method of correcting such release or discharge of inadequately treated sewage except by locating a new or expanding an existing surface-discharging wastewater treatment plant within the 60 day travel time to intake; and (iii) The applicant has demonstrated that there are no sources of inflow or infiltration to the sewer system of the new or expanded wastewater treatment plant, other than sources that are to be eliminated pursuant to a consent order or other commitment binding on the applicant, that can practicably be eliminated.
(iii)if the applicant seeks to construct a new wastewater treatment plant, the flow to the new wastewater treatment plant may include only reasonably anticipated flows from the area(s) identified as source(s) of contamination pursuant to clause (a) of subparagraph (i) of paragraph (1) of subdivision (e) of this section.