§ 11-10 Postponements.
RCNY § 11-10
(a)An owner may apply to the department in writing for postponement of the time to correct a lead-based paint hazard violation issued pursuant to § 27-2056.6 or § 27-2056.6.1 of Article 14 of the Housing Maintenance Code within the five days preceding the date set for correction of such violation pursuant to § 27-2115(l)(1).
(b)Grant of a postponement shall be in the sole discretion of the department, and will be limited to circumstances where a showing has been made by the owner, to the satisfaction of the department, that such owner has taken steps to correct the violation promptly but that full correction could not be completed expeditiously because of the existence of a serious technical difficulty, inability to obtain necessary materials, funds or labor, or inability to gain access to the dwelling unit or other area of the building necessary to make the required repair. An application for postponement shall contain a detailed statement by the registered owner or agent, or registered managing agent, explaining the steps taken to correct the violation promptly and the specific circumstances surrounding the inability to fully correct the violation within the time set for correction of the violation. Where an owner claims inability to gain access, such application shall include a description of the steps taken to gain access, including but not limited to providing a written notice to the tenant, delivered by certified or registered mail, informing the tenant of the necessity of access to the dwelling unit to correct the violation and the reason why access could not be gained.
(c)1) The department shall make a determination in writing whether the postponement shall be granted or denied, and the reasons therefor. The department may include such other conditions as are deemed necessary to insure correction of the violation within the time set by the postponement. If the postponement is granted, a new date for correction shall be set, which shall not exceed fourteen days from the date set for correction in the notice of violation, provided, however, that the department may grant an additional postponement of fourteen days where the department determines that the conditions which is the subject of the violation has been stabilized.
(2)The department may grant a postponement of the time to correct a lead-based paint hazard violation in excess of the twenty-eight days provided for in paragraph (1) of this subdivision, where the department determines that the work to be done to remediate the violation includes one or more substantial capital improvements to be made in conjunction with such work, and that such improvements will significantly reduce the presence of lead-based paint in such multiple dwelling or dwelling unit, provided that the paint which is the subject of the violation is stabilized. An owner who applies for such longer postponement shall submit an application within the time period specified in subdivision (a) of this section, and shall include with such application such documentation as the department may require to make its determination, which may include, but is not limited to, written contracts for work, building permits, plans filed with the department of buildings; invoices for materials purchased; and evidence that work has commenced and substantial progress has been made. (Amended City Record 2/14/2025, eff. 3/16/2025)